Ajman · United Arab Emirates · Est. 2001
The steel you never see.
We fabricate and install the structure behind finished buildings — operable wall supports, mezzanines, staircases and fit-out steelwork. Drag the line to see what holds the room up.
Most of our work is behind a ceiling.
Al Amiri Contracting has fabricated structural steel in Ajman since 2001. The specialism we are known for — the support structure that carries an operable wall — is invisible the moment the ceiling closes. That is the point.
Design, fabrication, finishing and installation happen under one roof in Jurf Industrial Area 1. Nothing is handed between companies, so nothing is lost in the handover. When a detail will not work as drawn, you hear it from the people who would have had to build it.



Six trades. One workshop.
Everything is cut, welded, finished and installed by the same team in Jurf. The specialism sits first because it is the reason most clients call.
Structural Steel & Mezzanines
Primary frames, mezzanine floors and platforms that add usable area without touching the building envelope.
Steel Staircases
Straight, dog-leg, spiral and feature stairs — from plant access to a lobby centrepiece.
Railings, Gates & Fencing
Balustrades, handrails, sliding and swing gates, perimeter fencing and access control-ready steelwork.
Industrial & Warehouse Structures
Portal frames, canopies, racking support steel, plant platforms and heavy-duty industrial fabrication.
Custom Steel Fabrication
One-off architectural metalwork, cladding support, screens, signage frames and anything a drawing calls for.
Where the steel ends up.
The same fabrication standard applies whether the piece is a lobby stair or a pipe rack. What changes is the finish, the documentation and the access.
Hospitality
Ballroom and conference partitions, feature stairs, balustrades.
Commercial
Office fit-out steel, cladding support, entrance canopies.
Industrial
Plant platforms, pipe racks, machine bases, portal frames.
Warehousing
Mezzanine floors, racking support, loading-bay canopies.
Retail
Shopfront frames, display structures, mall balustrades.
Residential
Villa staircases, gates, privacy screens, pergolas.
Infrastructure
Walkways, access platforms, service structures.
Government
Institutional fit-out steel to public-sector specification.
Why contractors keep coming back.
Not because we are the cheapest quote in the folder. Because the steel arrives when it was promised, fits what was surveyed, and comes with the paperwork already done.
Since 2001
Two decades of steel packages in the UAE — long enough that buildings we worked on are now being refurbished.
Engineering in-house
Shop drawings, connection design and load checks are produced by our own team, not subcontracted.
Millimetre tolerance
Setting-out is surveyed and recorded. Where the drawing says ±3 mm, we work to ±3 mm.
Documented quality
Material certificates, weld procedures and inspection records issued with every package.
Safety as method
Method statements and risk assessments written for the actual site, not copied forward.
Programme kept
Fabrication is sequenced to your installation window, and we tell you early if anything threatens it.
Selected work.
Two recent packages, described by what the steel had to do. The full client list — 57 organisations across six sectors — is on the projects page.

Aster
Al Quoz, Dubai
Structural steel mezzanine over the warehouse floor: columns on pad bases, an access staircase and edge protection to the full deck perimeter.

Dubai Harbour Marinas — Shamal
Dubai Harbour, Dubai
Powder-coated expanded-mesh service enclosures with hinged lids and lockable doors, built for a marina promenade in permanent salt exposure.
From drawing to hand-over, in six moves.
Discovery
We read the drawings, walk the site and establish what the steel actually has to do.
Engineering
Shop drawings, section sizing, connection design and clash review — issued for your approval.
Fabrication
Cutting, forming and welding in Jurf to approved drawings and welding procedures.
Finishing
Galvanising, coating or polishing to the specified system, with film thickness recorded.
Installation
Set out from a surveyed datum, installed by our own crews under an agreed method statement.
Hand-over
Inspection, as-built mark-up, certificates and O&M documentation issued together.
What they say afterwards.
Collected from project directors, engineers and architects we have worked alongside.
The ballroom partitions were the one item on the programme nobody wanted to own. Al Amiri took the load schedule, produced drawings in a week and set the steel before the ceiling grid went in. It was the least dramatic part of the job.
We had four weekend shutdowns to install a mezzanine over a running despatch operation. They planned it around us rather than the other way round, and despatch never stopped.
They told us the balustrade detail as drawn would not meet the handrail loading, and came back with a version that did and still looked right. That conversation saved a rework.
Certificates, weld records and as-builts arrived with the steel instead of three weeks after it. Our QA sign-off took an afternoon.