Completed hotel ballroom with the partition closed
The steel support structure above the same ballroom ceiling

Ajman · United Arab Emirates · Est. 2001

The steel you never see.

We fabricate and install the structure behind finished buildings — operable wall supports, mezzanines, staircases and fit-out steelwork. Drag the line to see what holds the room up.

0Established in Ajman
0+Projects delivered
0tSteel fabricated
0%On-time hand-over
001Who we are

Most of our work is behind a ceiling.

Al Amiri Contracting has fabricated structural steel in Ajman since 2001. The specialism we are known for — the support structure that carries an operable wall — is invisible the moment the ceiling closes. That is the point.

Design, fabrication, finishing and installation happen under one roof in Jurf Industrial Area 1. Nothing is handed between companies, so nothing is lost in the handover. When a detail will not work as drawn, you hear it from the people who would have had to build it.

0Years fabricating
0+Projects delivered
0%Work from repeat clients
Steel mezzanine structure carrying a warehouse floor
Welder working on a fabricated beam
Inspection record attached to a finished fabrication
002What we build

Six trades. One workshop.

Everything is cut, welded, finished and installed by the same team in Jurf. The specialism sits first because it is the reason most clients call.

Operable Wall Steel Supports
Our specialism

Operable Wall Steel Supports

The primary structure a moving wall hangs from — designed to the manufacturer's load case and set to millimetre tolerance.

S-01
Steel Staircases

Steel Staircases

Straight, dog-leg, spiral and feature stairs — from plant access to a lobby centrepiece.

S-03
Railings, Gates & Fencing

Railings, Gates & Fencing

Balustrades, handrails, sliding and swing gates, perimeter fencing and access control-ready steelwork.

S-04
Custom Steel Fabrication

Custom Steel Fabrication

One-off architectural metalwork, cladding support, screens, signage frames and anything a drawing calls for.

S-06
003Industries served

Where the steel ends up.

The same fabrication standard applies whether the piece is a lobby stair or a pipe rack. What changes is the finish, the documentation and the access.

Hospitality projects
01

Hospitality

Ballroom and conference partitions, feature stairs, balustrades.

Commercial projects
02

Commercial

Office fit-out steel, cladding support, entrance canopies.

Industrial projects
03

Industrial

Plant platforms, pipe racks, machine bases, portal frames.

Warehousing projects
04

Warehousing

Mezzanine floors, racking support, loading-bay canopies.

Retail projects
05

Retail

Shopfront frames, display structures, mall balustrades.

Residential projects
06

Residential

Villa staircases, gates, privacy screens, pergolas.

Infrastructure projects
07

Infrastructure

Walkways, access platforms, service structures.

Government projects
08

Government

Institutional fit-out steel to public-sector specification.

004Why Al Amiri

Why contractors keep coming back.

Not because we are the cheapest quote in the folder. Because the steel arrives when it was promised, fits what was surveyed, and comes with the paperwork already done.

01

Since 2001

Two decades of steel packages in the UAE — long enough that buildings we worked on are now being refurbished.

02

Engineering in-house

Shop drawings, connection design and load checks are produced by our own team, not subcontracted.

03

Millimetre tolerance

Setting-out is surveyed and recorded. Where the drawing says ±3 mm, we work to ±3 mm.

04

Documented quality

Material certificates, weld procedures and inspection records issued with every package.

05

Safety as method

Method statements and risk assessments written for the actual site, not copied forward.

06

Programme kept

Fabrication is sequenced to your installation window, and we tell you early if anything threatens it.

005Recent work

Selected work.

Two recent packages, described by what the steel had to do. The full client list — 57 organisations across six sectors — is on the projects page.

Steel mezzanine floor, columns and access staircase inside the Aster warehouse at Al Quoz
Education & healthcare

Aster

Al Quoz, Dubai

Structural steel mezzanine over the warehouse floor: columns on pad bases, an access staircase and edge protection to the full deck perimeter.

White powder-coated expanded-mesh enclosures on the promenade at Dubai Harbour
Free zones, logistics & data centres

Dubai Harbour Marinas — Shamal

Dubai Harbour, Dubai

Powder-coated expanded-mesh service enclosures with hinged lids and lockable doors, built for a marina promenade in permanent salt exposure.

0+Projects delivered
0Years in operation
0+Repeat clients
0Emirates covered
0tSteel fabricated
0%On-time hand-over
006How we work

From drawing to hand-over, in six moves.

01

Discovery

We read the drawings, walk the site and establish what the steel actually has to do.

02

Engineering

Shop drawings, section sizing, connection design and clash review — issued for your approval.

03

Fabrication

Cutting, forming and welding in Jurf to approved drawings and welding procedures.

04

Finishing

Galvanising, coating or polishing to the specified system, with film thickness recorded.

05

Installation

Set out from a surveyed datum, installed by our own crews under an agreed method statement.

06

Hand-over

Inspection, as-built mark-up, certificates and O&M documentation issued together.

007Client feedback

What they say afterwards.

Collected from project directors, engineers and architects we have worked alongside.

The ballroom partitions were the one item on the programme nobody wanted to own. Al Amiri took the load schedule, produced drawings in a week and set the steel before the ceiling grid went in. It was the least dramatic part of the job.

Project DirectorProject DirectorMain contractor, Dubai

We had four weekend shutdowns to install a mezzanine over a running despatch operation. They planned it around us rather than the other way round, and despatch never stopped.

Operations ManagerOperations ManagerLogistics operator, Jebel Ali

They told us the balustrade detail as drawn would not meet the handrail loading, and came back with a version that did and still looked right. That conversation saved a rework.

Associate ArchitectAssociate ArchitectDesign consultancy, Abu Dhabi

Certificates, weld records and as-builts arrived with the steel instead of three weeks after it. Our QA sign-off took an afternoon.

QA / QC EngineerQA / QC EngineerFit-out contractor, Sharjah
Start a conversation

Send the drawing. We will tell you what it takes to build.

Drawings, a sketch or a photograph of the space — whatever you have. You will get a considered answer from someone who has built it before, usually within one working day.